Field NameCodesData TypeUnitsTest ProtocolDescription
SHRP_ID

VARCHAR2(4)


Test section identification number assigned by LTPP program. Must be combined with STATE_CODE to be unique.
HAUL_DISTANCE2

NUMBER(3)
mi

Haul distance from mix plants to project site.
HAUL_TIME2

NUMBER(3)
min

Haul time from mix plants to project site.
PLANT_NAME3

VARCHAR2(40)


Name of PCC mix plant.
HAUL_DISTANCE3

NUMBER(3)
mi

Haul distance from mix plants to project site.
HAUL_TIME3

NUMBER(3)
min

Haul time from mix plants to project site.
PAVER_TYPE
PAVER_TYPENUMBER(1)


Code indicating the type of paver used.
PAVER_TYPE_OTHER

VARCHAR2(40)


Type of paver used if other than those listed.
PAVER_MANUFACTURER_MODEL

VARCHAR2(40)


Name of manufacturer of paving equipment.
SPREADER_TYPE

VARCHAR2(40)


Generic type of spreader used in the paving operation.
SPREADER_MANUFACTURER_MODEL

VARCHAR2(40)


Name of the manufacturer of the spreader equipment.
STATE_CODE
STATE_PROVINCENUMBER(2)


Numerical code for state or province. U.S. codes are consistent with Federal Information Processing Standards.
LAYDOWN_WIDTH

NUMBER(3,1)
ft

Width of the finished concrete from a single pass of the paving train.
DOWEL_PLACE_METHOD
DOWEL_PLACE_METHODNUMBER(1)


Code indicating method used to place dowel bars.
NUMBER_OF_VIBRATORS

NUMBER(2)


Number of spud vibrators integral with the paver used in consolidating the concrete.
VIBRATOR_SPACING

NUMBER(2)
in

Average spacing between the spud vibrators.
DEPTH_OF_VIBRATORS

NUMBER(3,1)
in

Depth below the concrete surface where vibrators are functioning.
ADDITIONAL_VIBRATION

VARCHAR2(80)


Any additional vibration used other than spud vibrators.
CONSOLIDATION
CONSOLIDATE_METHOD_FULLNUMBER(1)


Code identifying the method used to consolidate materials.
CONSOLIDATION_OTHER

VARCHAR2(40)


Method used to consolidate materials if other than those listed.
FINISHING
FINISH_METHOD_ANUMBER(1)


Code indicating method used to finish the concrete.
FINISHING_OTHER

VARCHAR2(40)


Method used to finish concrete if other than those specified.
LAYER_NO

NUMBER(2)


Unique sequential number assigned to pavement layers, starting with layer 1 as the deepest layer (subgrade).
CURING
CONCRETE_CURENUMBER(1)


Code indicating method used to cure the concrete.
CURING_OTHER

VARCHAR2(40)


Method used to cure concrete if other than those listed.
TEXTURING
TEXTURINGNUMBER(1)


Code indicating method used to provide a surface texture on the concrete.
TEXTURING_OTHER

VARCHAR2(40)


Method used for texturing concrete if other than those listed.
RECORD_STATUS

VARCHAR2(1)


A code indicating the general quality of the data.
DATE_BEGAN

DATE


Date operations began.
DATE_COMPLETE

DATE


Date activity was completed.
PLANT_NAME1

VARCHAR2(40)


Name of PCC mix plant.
HAUL_DISTANCE1

NUMBER(3)
mi

Haul distance from mix plants to project site.
HAUL_TIME1

NUMBER(3)
min

Haul time from mix plants to project site.
PLANT_NAME2

VARCHAR2(40)


Name of PCC mix plant.